Total Comments 31 | Start A New Comment
Post Info Comment
Posted By: roulette

Posted On: Feb 21, 2011
Views: 1364
Paralyse Exactitude

Ditty of the newest U.S. facing online casinos to known from the regulatory clutches of Curacao (know homepage representing validation seal), Posh Vegas actually has uncountable years of gaming face comprised in its belt. The Lavish Vegas Casino government troupe has been approximately since the appear of online gambling, and in summing-up to earning a sound status be known with players, has managed some of the most loaded online casinos to date.


Posted By: roulette

Posted On: Feb 15, 2011
Views: 1366
Framework Firmness

One of the newest U.S. overlay online casinos to known from the regulatory clutches of Curacao (know homepage representing validation seal), Posh Vegas in fact has numerous years of gaming experience comprised in its belt. The Grand Vegas Casino management cooperate has been 'round since the appear of online gambling, and in adding up to earning a solid name with players, has managed some of the most well-fixed online casinos to date.


Posted By: casino en ligne

Posted On: Feb 14, 2011
Views: 1367
Assembly Exactitude

One of the newest U.S. front online casinos to on from the regulatory authority of Curacao (recognize homepage for validation seal), Grand Vegas as a matter of fact has many years of gaming participation junior to its belt. The Lavish Vegas Casino directing team has been around since the appear of online gambling, and in adding up to earning a sound standing with players, has managed some of the most loaded online casinos to date.


Posted By: casino en ligne

Posted On: Jan 28, 2011
Views: 780
House Persistence

Blizzard warnings were issued for parts of Illinois, Iowa, Michigan, Minnesota and Wisconsin as snow socked the states in tandem with breeze gusts topping 45 miles (72 kilometers) per hour.
The blizzard -- 10 days anterior to the charge of winter -- took its greatest levy in Minnesota, where as much as two feet (61 centimeters) of snow had fallen in some locations, according to the Inhabitant Sickly Service (NWS).
The country's largest big apple Minneapolis was directed a blanket of corpse-like 17 inches (43 cm) deep, the worst snowfall to hit the urban district in more than 19 years and the fifth-biggest on record.
As an incriminate in of the simoom's mercilessness, Minneapolis-St. Paul Global Airport -- a traversing focal point with expertise in contending with unclean seedy -- was shush down in return the oldest one day in years.


Posted By: casino en ligne

Posted On: Jan 27, 2011
Views: 781
Bagnio Resolution

Blizzard warnings were issued for parts of Illinois, Iowa, Michigan, Minnesota and Wisconsin as snow socked the states in tandem with wind gusts topping 45 miles (72 kilometers) per hour.
The shower -- 10 days anterior to the hit of winter -- took its greatest toll in Minnesota, where as much as two feet (61 centimeters) of snow had fallen in some locations, according to the Nationalistic Weather Advantage (NWS).
The state's largest city Minneapolis was directed a blanket of corpse-like 17 inches (43 cm) profound, the worst snowfall to charge the city in more than 19 years and the fifth-biggest on record.
As an with of the thunder-shower's oppressiveness, Minneapolis-St. Paul Global Airport -- a transit heart with expertise in contending with unclean unwell -- was keep quiet down exchange for the gold medal notwithstanding in years.


Posted By: Nike Air Max 90

Posted On: Jan 29, 2010
Views: 1034
airmax90

Thank you for sharing.Nice post.


Posted By: 2E2

Posted On: Sep 29, 2009
Views: 892
32



Posted By: Q2231

Posted On: Sep 29, 2009
Views: 873
231



Posted By: replia lv handbags

Posted On: Sep 23, 2009
Views: 910
wholesale watch replica watches Cartier watch

very good


Posted By: emygold

Posted On: Aug 22, 2009
Views: 913
http://www.emygold.com



Posted By: Ahmed ubale

Posted On: Apr 2, 2009
Views: 1098
Yar'aduas resignation.

Nigerians lets keep sentiment and tribalism aside and think positive as youth ,lets think of Mother nigeria. we need visionary leaders like yar'adua and his cabinet to move this country forward, bcos we have no other country than Nigeria. Therefore lets, unite and think way forward to join our President and his cabinet to move this country to the next level.


Posted By: DES

Posted On: Feb 11, 2009
Views: 1143
The web poll

How could you ask a question on yaradua and bring out another result on a different thing altogether? It is either your system has problems or you did it on purpose.


Posted By: Franc L

Posted On: Sep 11, 2008
Views: 1610
WHAT A TRANSFORMATION

Can anybody tell me what happened to these industries and factories in Ondo state before Agagu took over the mantle of leadership in Ondo state? These are: Okitipupa Oil Palm, Ipoke Oil Mill, Araromi Aiyesan Oil Palm, Oke Ayo Farms, Nigerian-Italian Ceramic Products Limited, Owena Mass Transportation Company, Cocoa Products Limited, Ile-Oluji, Owena Motels Limited etc.

Under Dr Olusegun Agagu, the above mentioned industries are transformed and effective.
• Okitipupa Oil Palm reactivated with a sum of N195.2m. 4000 employees now engaged.
• Ipoke Oil Mill reactivated and its capacity increased from 1.5 MT to 4.5MT per hour
• Araromi Aiyesan Oil Palm Plc revamped.
• Oke Ayo Farms revived and renamed Sunshine Food Processing Company with a capacity to
produce 10 tonnes of cassava flour per day. Government has injected N4.5m into the company to encourage farmers to grow cassava.
• Nigerian-Italian Ceramic Products Limited repurchased from liquidator at a cost of N72m and renamed Golden Ceramic Products Company Limited, preparatory to privatization and currently employs 204 persons.
• Owena Mass Transportation Company was privatised after its N38.5m debt was paid by
the government.
• Cocoa Products Limited, Ile-Oluji privatized.
• Owena Motels Limited leased to NICON Luxury Limited (NLL) for better management (at N62.5m for 3 years).


Posted By: Franc. L

Posted On: Sep 11, 2008
Views: 1602
ROAD NETWORK IN ONDO STATE UNDER AGAGU

ROAD NETWORK IN ONDO STATE

People have rights to express their view; yet critics should not forget that there are positive changes in terms of Road Network in Ondo state under Dr. Olusegun Agagu. The government has constructed & rehabilitated over 60 roads in the past five (5) years. For instance, the Construction of Ilutitun Township Rd. including Eddie Hotel Gorge, Construction of GRA Oke-Oyinbo, Okitipupa (175m), Patching Erosion control near Catholic Church, Okitipupa, Patching of Township Rd Viz-Igbokoda-Okitipupa-Ile Oluji-Okegbo, Roads Clearing of Water Ways in Irele, Okitipupa and Ilaje LGAs (53,000m2), Maintenance and Patching of Urban and Rural Roads, Canaan Land culvert and Retaining wall, Akure, Construction of Justice Ogunwunju St FUTA, Akure, Rehabilitation of Ade Super Road, Akure (0.31km), Rehabilitation of Ilupeju, Ondo (0.45km), Rehabilitation of Odosida, Ondo (2.3km), Rehabilitation. of Better Life Road, Ondo (0.60km), Rehabilitation of Barrack Road, Ondo/Akure (0.32km), Rehabilitation of General Hospital Road, Ondo (1.165km), Repairs and patching of Urban / Rural Roads, Ondo (4.6km), Construction of Olamojiba Street, Ondo (0.26km), Rehabilitation of Omotosho Road (2.700km), Akungba Township Roads (5km), Akure Township Zone E (21.065km).
Others are: Dualisation of Ilesha Motor Park Ilesha/Owo junction (2.3km), Ayede Ogbese Ago Dada (25km) Extension to Ala, Ajue Township Road (1.393km), Okitipupa Erinje Obonde Road (10.6km), Okitipupa Township Road Phase 1 (11.2km), Owo-Ikare-Oka Township Road (24.4km), Idanre-Alade Township-Owena Road (20km), Ore-Okitipupa Road completed and regularly maintained, Asphalt Overlay of Okitipupa-Akinfosile Junction Road (34km), Channelisation of 525 metres of Waterways (67.1km), Aule-Ilesa Motor Park Road, Akure (800km), Ajipowo Road, Akure (3.5km), Osinle-Ijoka Road spurs Omosule, Akure, Odosida Road, Ondo, Patching and Repair of Ikare Township Road (3.214km), Patching and Repair of Asoloeso Street, Ondo (11.7km), Patching of Akinmorin Street,Ondo (450m), Rehabilitation of Club Road GRA, Ondo (1.0km), Rehabilitation of Mercy Land Avenue Valentino, Ondo (phase I)(1.25km), Construction of Agadagba Pereamas-Ajapa Road (4km), Construction of Ebijaw Zion-beach Road phase I(6.5km), Construction of Kunehin ST extension, Okitipupa (500m), Maintenance and patching of Urban and Rural Roads (8.802km), Maintenance and patching of Urban and Rural Roads (5.481km), Patching of new Stadium Plaza-Oke Ijebu Road, Akure (2.4km), Alagbaka Box Culvert 3 Nos (3mx2m), Alpha Motel Box Ulvert (3mx1.5m), New Town Box Culvert (2.7mx1.5m), Fanibi Box Culvert, Akure (1&2), Bola meat police Station-Akinniranye Road, Okuta Elerin nla, Akure (980m), Rehabilitation of Ola Amuda Fatukasi Road, Akure (300m), Rehabilitation of Agunloye Road, Akure (600m), Rehabilitation of Ajakaye Road, Akure (760m), Rehabilitation of Oke Orire Road, Akure (140m), Rehabilitation of Green Park Tinu Lodge Familiusi Quarter, Akure, (1.03km), Rehabilitation of Olofintoye Micheal Aliu Street (950m), Rehabilitation of Isijola Close, Akure (450m), Rehabilitation of L.A. Primary School, Iju Road (1.02km), Rehabilitation of Irepodun, Akure (660m), Rehabilitation Of Agape Road, Akure (580m), Rehabilitation of Sam Olukayode Street Alagbaka Estate Akure. (870m), Ikoya Igbisin Oloto (11.77km) and so on.



Posted By: Franc L

Posted On: Sep 11, 2008
Views: 1528
PERFORMANCE OR POLTICAL GIMMICKS?

There are those who believe that present administration in Ondo state under the leadership of Dr Olusegun Agagu has not done 'anything' in terms of developments in spite of the promises he made in 2003 to develop the land and the people better than he met it. The question is: are there significant changes in the state for the past five (5) years? Besides sentiments, political or religion differences, let us take a look at some selected sectors in the state.

In Education Sector, some will subscribe to the opinion that the government has not performed, yet the quality of education in Ondo state has been improved through the Establishment of new Zonal Offices to supervise the 18 Area Education Offices, appointment of 216 Neighbourhood inspectors for primary, and secondary schools, 442 model blocks of 6 classrooms; 37 blocks of 3 classrooms, and 132 blocks of 8 classrooms constructed for Junior Secondary, Primary Schools and early child education centres, respectively, 183 primary school buildings, 80 primary schools teachers trained in use of the computer, Provision of standard science laboratory equipment in Physics, Chemistry, Biology and Mathematics to all the 300 Secondary schools in the state. Yet, some people believe the government has not done anything. Is this performance or political gimmicks?


Pages [ 1 2 3 ] Next Page ->